Chasewater Railway
Heritage steam and diesel locos
 
OTHER DEPARTMENTS » PERMANENT WAY
Permenent Way department on rail replacement
Permanent Way Dept

The Permanent Way Department is responsible for the maintainence, renewal and installation of the track, which includes plain line and Switches and Crossings (S&C) for the Railway.

Recently completed projects for the PWay Department include track renewals on the Causeway Bank, track-bed consolidation and track renewal between Norton Lakeside and Chasewater Heaths, and completion of the storage siding/refuge at Chasewater Heaths Station.

Forthcoming Projects

  • Sleeper replacement on the Causeway
  • Completion of S&C at Chasewater Heaths to re-instate the bay platform
  • Provision of siding accommodation and road/rail loading facility at Chasewater Heaths Station

Future Projects

  • Provision of a further storage siding at Brownhills West, between the overflow car park and Bay Platform No.1

 
  Home |  Find Us |  Railway History |  Railway Map |  Our Services |  Links |  Join Us |  News |  Timetables & Fares |  Santa Specials |  Locos & Stock |  The Sidings Tea Room
Railway Museum |  Galleries |  Narrow Gauge |  Permanent Way |  S&T Department |  Driver Experience |  Educational Visits |  Groups & Parties |  Contact Us